Meeting Minutes for 25 October 2005 CVMBS College Council

 

Senate (Reporting were Robert Sons, Katrina Aspnes, and Megan Royer)

-Major discussion was about the new addition that will be built on to the Microbiology building.  The NW corner of the building will be expanded to include a study area.  It will include computer kiosks, and hopefully either laptops for checkout, or some CPU stations.

 

UTFAB (Reporting was Tiffany Weiss)

-The General Classroom Assignment Director has in progress the following improvements to our Microbiology building:

1) A101 will be getting the 2 corner screens instead of the one in the middle it has now, so that they can be seen from all seats in the room.  Cost: $12,146  Timeline: to be completed over Christmas break.

2) A113 will be getting a smart classroom upgrade.  Cost: $9,994

-The Facility Fee Advisory Board is looking for new members.  The would like a representative from each CC.  Their next meeting will be at 3:30pm, Thursday November 3rd.  For more information please contact Tiffany Weiss.

 

Alternate College Council (Reporting was Vanessa Moore)

-Discussions included:

-S. Campus Study Area (see addition to Micro under Senate).

-CSU Honor Code Meeting, run by Missy Leonard, Academics Director is scheduled for December 13th at 3:00pm.  For more information please contact Missy Leonard.

-NOTE: For your information, all teacher evaluations that you do are put online, however, the comments section only gets on if you sign the evaluation. 

 

Robert Snorted (Everyone laughed J)

 

Proposals (All participated)

-We have an estimated balance of $86,330 to use for technological improvements.

-Proposals totaled $26,220

-Proposals that were approved:

Name

Class

CVMBS/Total

Description

Cost

Doreene Hyatt

MB335

25/30

Stomacher (1)

$3,611.03

John Tessari

EH230

29/32

Multiple items

$7,940.50

Deryl Keney

MB301,335 & LS206

94/218

Hotplate Stirrers (4)

$1,202.00

William Black

MB462

25/30

Centrifuge (1), Illuminators (10), and Scissors (20)

$5,049.57

RoxAnn Karkhoff-Schweizer

MB550

?

Combs (4)

$155.32

Computer Lab

N/A

All

Extension Cables

$140.00

-Proposals that were not approved at this time:

Name

Class

CVMBS/Total

Description

Cost

Connie Vader-Lindholm

BS302

Est. 100/320

Intelitool Equip (1), BP Equip (8), Ergonomic Stools (40)

$6,721.50

Donald Klein

MB300, 432

50/225

Gateway Tablet PC

$1,399.99

 

 

This concludes our meeting.

 

Typed by Amanda Draine 27 October 2005